Project evidence

Commercial outcomes backed by engineering detail.

We explain the treatment route, operating philosophy and evidence behind each project, while protecting customer confidentiality.

Containerised river water treatment plantAnonymous chemical manufacturing project
Boiler feed project

River water replaced purchased utility water.

An anonymous chemical manufacturer replaced purchased utility water with a resilient, containerised 15 m³/h river water treatment plant.

15 m³/htotal RO capacity
18 monthscalculated payback
≈5%gas bill reduction later reported
Redundantequipment for uptime

Evidence language: payback was calculated during the project. The gas saving was an unexpected benefit reported by the customer after commissioning.

Read the complete case study
Aluminium coating line reverse osmosis and rinse water recovery plantAnonymous manufacturing project
Rinse water recovery

Low conductivity water returned to an aluminium coating process.

Hydra-Clear designed a two stage treatment and recovery route around a 7.5 m³/h Hydraconomy RO, rinse bath clarification, a recovery RO and mixed bed polishing.

7.5 m³/hprimary RO design flow
<10 µS/cmrinse water quality target
95%primary RO design recovery
Recoveredwater returned to the process loop

Project basis: figures describe the design duty supplied by the customer. No unsupported financial saving is claimed.

Read the complete case review
High integrity special builds

Mechanical engineering beyond standard treatment skids.

Nuclear grade project experience includes bespoke pressure filtration, water storage and handling, distribution assemblies and mobile point of use polishing.

Full aluminium project review

A staged recovery loop built around rinse quality and treatability.

The system was designed around an aluminium coating line requiring low conductivity water at the rinse baths. The recovery route separates settleable solids and heavy metals before membrane treatment and final polishing.

01Primary RO7.5 m³/h Hydraconomy supplies water below the 10 µS/cm rinse target
02Rinse collectionUsed rinse water is captured from the coating line
03ClarificationSettling and coagulation remove heavy metals and suspended solids
04Recovery ROClarified water is treated through a second Hydraconomy system
05Polish and returnMixed bed polishing prepares permeate for return to the primary RO feed

Recirculation: concentrate from the recovery RO returns to the settling and coagulation stage for a further pass. Collected solids are removed periodically for appropriate disposal.

Need support for equipment already on your site?

Standalone service and maintenance contracts are available for all manufacturers across every sector shown.

Explore service support